Articles About RWE OWI Platform

Optimal Waste Intelligence

AI Insights for Waste-to-Energy

Expert analysis on AI-driven waste management, pyrolysis, circular economy, and zero-waste-to-landfill operations.

Your Waste Analytics Dashboard Is Only as Honest as Its Worst Sensor
9 min read

Your Waste Analytics Dashboard Is Only as Honest as Its Worst Sensor

Real-time waste analytics fails at the data layer, not the dashboard. An engineer on what the screen shows, where the numbers break, and what it costs.

Read article →
40,000 Tonnes a Year, Locked for a Decade: Why Plastics-to-Fuels Lives or Dies on Feedstock Security
6 min read

40,000 Tonnes a Year, Locked for a Decade: Why Plastics-to-Fuels Lives or Dies on Feedstock Security

Abundia locked a decade of polyolefin feedstock before building Cedar Port. Why feedstock security, not the reactor, decides plastics-to-fuels projects.

Read article →
Waste-to-Energy Makes 34 MW. AI Data Centers Want 1,500.
8 min read

Waste-to-Energy Makes 34 MW. AI Data Centers Want 1,500.

Waste to energy data centers sound like baseload for the AI boom, until you run the megawatts. What a 34 MW plant can and can't feed, and where it fits.

Read article →
Why Does Waste-to-Energy in India Keep Stalling? Look at What's in the Bin
9 min read

Why Does Waste-to-Energy in India Keep Stalling? Look at What's in the Bin

Waste-to-energy in India keeps stalling, and the boiler isn't why. Delhi's plants take 5,600 tonnes a day; barely 1,100 will burn. The fix is upstream.

Read article →
Your Waste-to-Energy Solution Is Only as Good as the Feedstock You Didn't Measure
8 min read

Your Waste-to-Energy Solution Is Only as Good as the Feedstock You Didn't Measure

Most waste-to-energy solutions fail because the technology gets picked before the feedstock is measured. Here's how moisture and calorific value decide the box.

Read article →
Carbon Capture on Energy from Waste Doesn't Pencil Without the Pipeline Next Door
7 min read

Carbon Capture on Energy from Waste Doesn't Pencil Without the Pipeline Next Door

Carbon capture energy from waste pencils at Encyclis Protos because of the HyNet cluster and a state contract, not cheaper capture. Here's the retrofit math.

Read article →
The Model Is the Easy Part: What Actually Breaks Industrial AI Projects
8 min read

The Model Is the Easy Part: What Actually Breaks Industrial AI Projects

Most industrial AI projects fail, and rarely because the model is weak. After building OWI, here's what actually breaks them: data, sensors, and integration.

Read article →
108 Euros a Tonne by 2030: What EU ETS Waste Incineration Inclusion Does to Your Gate Fee
8 min read

108 Euros a Tonne by 2030: What EU ETS Waste Incineration Inclusion Does to Your Gate Fee

EU ETS waste incineration inclusion could add EUR 74-132 per tonne to gate fees by 2030. The biogenic share you can't defend is what sets your bill.

Read article →
How Does Waste-to-Energy Project Finance Work? Underwrite the Tipping Fee, Not the Megawatt
7 min read

How Does Waste-to-Energy Project Finance Work? Underwrite the Tipping Fee, Not the Megawatt

Waste to energy project finance sizes debt off the PPA. That's the wrong number: the tipping fee is the only contractual line. Here's how to underwrite it.

Read article →
Africa's Dumpsite Crisis Is Real. Imported Waste-to-Energy Plants Keep Underperforming.
7 min read

Africa's Dumpsite Crisis Is Real. Imported Waste-to-Energy Plants Keep Underperforming.

Waste to energy in Africa keeps underperforming, and Reppie shows why: plants built for dry European trash choke on wet, organic waste. Here's the real fix.

Read article →
TOMRA GAINnext Sorts PET Trays at 95% Purity. The Number You Should Ask About Is Recall.
8 min read

TOMRA GAINnext Sorts PET Trays at 95% Purity. The Number You Should Ask About Is Recall.

TOMRA GAINnext hit 95% PET tray purity and a 51% PolyPerception stake at IFAT 2026. An engineer's read on recall, conversational plant control, and copper meatballs.

Read article →
Viridor Pulls the Plug on Quantafuel: What 'Commercially Uninvestable' Means for Pyrolysis Project Finance
8 min read

Viridor Pulls the Plug on Quantafuel: What 'Commercially Uninvestable' Means for Pyrolysis Project Finance

The Viridor Quantafuel shutdown wasn't a tech failure - Skive hit 75% yield. Plastics-to-liquids pyrolysis economics broke on capital structure, not policy.

Read article →
Renewable Natural Gas From Anaerobic Digestion: Why Projects Stall at the Injection Meter
7 min read

Renewable Natural Gas From Anaerobic Digestion: Why Projects Stall at the Injection Meter

Renewable natural gas from anaerobic digestion clears the methane spec easily. The oxygen limit, interconnection queue, and RIN offtake are what stall projects.

Read article →