Articles Authors About RWE OWI Platform

Optimal Waste Intelligence

AI Insights for Waste-to-Energy

Expert analysis on AI-driven waste management, pyrolysis, circular economy, and zero-waste-to-landfill operations.

What a Waste-to-Energy Scrubber Actually Captures Isn't Dioxins
9 min read

What a Waste-to-Energy Scrubber Actually Captures Isn't Dioxins

The scrubber strips acid gas; activated carbon and the baghouse catch waste to energy dioxins. What modern flue gas treatment really removes, myth by myth.

Read article →
152 Units, No Fixed Compliance Date: How the Large Municipal Waste Combustor Rule Hands Your Clock to the States
7 min read

152 Units, No Fixed Compliance Date: How the Large Municipal Waste Combustor Rule Hands Your Clock to the States

The large municipal waste combustor rule covers 152 units but sets no compliance date. Your state plan does, and if the state misses, EPA writes it instead.

Read article →
Which Waste Projects Actually Qualify for the Clean Electricity Tax Credit in 2026?
7 min read

Which Waste Projects Actually Qualify for the Clean Electricity Tax Credit in 2026?

The clean electricity tax credit turns on a zero-emissions line, not on whether waste is renewable. What 45Y and 48E actually cover for waste in 2026.

Read article →
SB 1383 Compliance Costs More Than the Trucks. The Procurement Rule Is Why.
8 min read

SB 1383 Compliance Costs More Than the Trucks. The Procurement Rule Is Why.

SB 1383 compliance isn't the green cart. The costly half is the procurement buy-back most California cities never budgeted, and penalties are now live.

Read article →
Waste-to-Energy Ash Is an Offtake Problem, Not a Disposal Line
9 min read

Waste-to-Energy Ash Is an Offtake Problem, Not a Disposal Line

Waste-to-energy ash disposal is a quarter of the input mass, and most US plants still landfill it. Bottom ash reuse and fly ash treatment decide the pro forma.

Read article →
Rhode Island Froze a $150M Sludge Pyrolysis Plant Over a Control Efficiency Nobody Could Measure
9 min read

Rhode Island Froze a $150M Sludge Pyrolysis Plant Over a Control Efficiency Nobody Could Measure

Rhode Island froze a fully permitted $150M plant. The real sludge pyrolysis permitting risk was a control efficiency nobody could actually measure.

Read article →
Waste to Biofuels Runs on a Credit With a Ceiling Almost Nobody Models
8 min read

Waste to Biofuels Runs on a Credit With a Ceiling Almost Nobody Models

Waste to biofuels pro formas model D3 RIN upside the Clean Air Act won't allow. The cellulosic waiver credit caps it, and the cap moves with gasoline.

Read article →
EPA's Biosolids PFAS Guidance Binds No One. It Will Still Shrink Land Application Faster Than a Rule.
10 min read

EPA's Biosolids PFAS Guidance Binds No One. It Will Still Shrink Land Application Faster Than a Rule.

EPA's biosolids PFAS guidance is non-binding, which is exactly why it will shrink land application acreage before any Part 503 rulemaking arrives.

Read article →
Landfill Gas to Energy Is the Cheapest Megawatt in Waste. So Why Are Operators Leaving?
7 min read

Landfill Gas to Energy Is the Cheapest Megawatt in Waste. So Why Are Operators Leaving?

Landfill gas to energy is the cheapest baseload megawatt in waste, yet top operators are leaving the engine. Why the RNG molecule now beats the kilowatt-hour.

Read article →
Waste-to-Energy REC Eligibility: Maryland Deleted 14% of Its Tier 1 With One Sentence
9 min read

Waste-to-Energy REC Eligibility: Maryland Deleted 14% of Its Tier 1 With One Sentence

Waste-to-energy REC eligibility died in Maryland's Tier 1 by statute, not economics. Why the REC was never an asset, and what to underwrite instead.

Read article →
Modular Waste Processing Sells a Schedule the Grid Won't Honor
8 min read

Modular Waste Processing Sells a Schedule the Grid Won't Honor

Modular waste processing erects in four months, then waits years on an interconnection queue. Why the second module never lands, and what to sell instead.

Read article →
99.99 Percent Destruction Is the Easy Part of Hazardous Waste Treatment
9 min read

99.99 Percent Destruction Is the Easy Part of Hazardous Waste Treatment

EPA's June 2026 rule adds hydrogen fluoride and cyanide limits to hazardous waste treatment permits. The kiln will hit its numbers. The monitoring plan won't.

Read article →
Is Pyrolysis an Incinerator? EPA Buried the Question in an Air Curtain Rule.
9 min read

Is Pyrolysis an Incinerator? EPA Buried the Question in an Air Curtain Rule.

EPA still hasn't settled the pyrolysis incinerator classification question, and the 10 TPD CEMS trigger decides your permit path before Section 129 ever does.

Read article →