What a Waste-to-Energy Scrubber Actually Captures Isn't Dioxins
The scrubber strips acid gas; activated carbon and the baghouse catch waste to energy dioxins. What modern flue gas treatment really removes, myth by myth.
Read article →Optimal Waste Intelligence
Expert analysis on AI-driven waste management, pyrolysis, circular economy, and zero-waste-to-landfill operations.
The scrubber strips acid gas; activated carbon and the baghouse catch waste to energy dioxins. What modern flue gas treatment really removes, myth by myth.
Read article →The large municipal waste combustor rule covers 152 units but sets no compliance date. Your state plan does, and if the state misses, EPA writes it instead.
Read article →The clean electricity tax credit turns on a zero-emissions line, not on whether waste is renewable. What 45Y and 48E actually cover for waste in 2026.
Read article →SB 1383 compliance isn't the green cart. The costly half is the procurement buy-back most California cities never budgeted, and penalties are now live.
Read article →Waste-to-energy ash disposal is a quarter of the input mass, and most US plants still landfill it. Bottom ash reuse and fly ash treatment decide the pro forma.
Read article →Rhode Island froze a fully permitted $150M plant. The real sludge pyrolysis permitting risk was a control efficiency nobody could actually measure.
Read article →Waste to biofuels pro formas model D3 RIN upside the Clean Air Act won't allow. The cellulosic waiver credit caps it, and the cap moves with gasoline.
Read article →EPA's biosolids PFAS guidance is non-binding, which is exactly why it will shrink land application acreage before any Part 503 rulemaking arrives.
Read article →Landfill gas to energy is the cheapest baseload megawatt in waste, yet top operators are leaving the engine. Why the RNG molecule now beats the kilowatt-hour.
Read article →Waste-to-energy REC eligibility died in Maryland's Tier 1 by statute, not economics. Why the REC was never an asset, and what to underwrite instead.
Read article →Modular waste processing erects in four months, then waits years on an interconnection queue. Why the second module never lands, and what to sell instead.
Read article →EPA's June 2026 rule adds hydrogen fluoride and cyanide limits to hazardous waste treatment permits. The kiln will hit its numbers. The monitoring plan won't.
Read article →EPA still hasn't settled the pyrolysis incinerator classification question, and the 10 TPD CEMS trigger decides your permit path before Section 129 ever does.
Read article →